ARO Electrical
Licensed & Insured
5-Star Rated
Punctual
Experienced
⚡ Florida's Premier Electrical Contractors

Professional ElectricalSolutions

High voltage and low voltage electrical services for residential, commercial, and industrial properties. Quality workmanship, competitive pricing, and reliable results you can count on.

0+
Projects Completed
0+
Years Experience
0+
Happy Clients

“ARO Electrical transformed our outdated electrical system. Professional, reliable, and exceeded our expectations!”

– Sarah M., Homeowner

“Prompt service and absolute attention to detail. The only electricians we'll call from now on.”

– Carlos V., Restaurant Owner

“They handled our entire warehouse re-fit flawlessly—on budget and ahead of schedule.”

– Lisa R., Logistics Manager

Our Services

High voltage and low voltage solutions - from simple repairs to complex installations

Residential Services
Complete electrical solutions for your home
  • Wiring & Rewiring
  • Panel Upgrades
  • Outlet Installation
  • Lighting Solutions
  • Safety Inspections
Commercial Services
Professional electrical work for businesses
  • Office Wiring
  • Fire Alarms
  • Emergency Lighting
  • Power Distribution
  • Code Compliance
Industrial Services
Safe, Scalable, and Code-Compliant for Industry
  • Heavy-Duty Systems
  • Preventive & Emergency Maintenance
  • Machine Wiring & Automation
  • Safety Upgrades
  • High-Voltage Work

Projects

Take a look at some of our recent work

Swipe
Camera Pole Power Integration – Solar Retrofit & 480V Conduit InstallationCommercial
Miami-Dade Aviation Department

Camera Pole Power Integration – Solar Retrofit & 480V Conduit Installation

  • Installed new conduit and wiring systems connecting 480V service panels to three solar-powered camera poles.
  • Executed directional boring beneath active roadways, along with trenching and backfilling as required.
  • Utilized specialized equipment including directional boring unit, concrete saw, and trencher.
  • Prepared and submitted permit applications with engineered shop drawings.
Terminal D Curbside Digital Display Power UpgradeCommercial
MDC Building Department

Terminal D Curbside Digital Display Power Upgrade

  • Reconfigured conduit paths between terminal electrical rooms to supply new digital signage displays.
  • Disconnected outdated 120V/20A branch circuits serving legacy display systems at Doors D10–D19.
  • Removed high-voltage 277V disconnects and associated wiring no longer in use.
  • Installed new 120V/208V branch circuits with weatherproof 2-pole 250V/20A disconnects for display infrastructure.
Fluke Load Monitoring – 30-Day Electrical Load AnalysisCommercial
MDAD Maintenance Department

Fluke Load Monitoring – 30-Day Electrical Load Analysis

  • Installed a dedicated 120V/20A receptacle connected to the existing power distribution panel.
  • Supplied, installed, and removed a calibrated load monitoring and logging system.
  • Generated and submitted a complete analytical report documenting 30 days of continuous load testing.
Lift Station 35 – Complete Electrical System ModernizationCommercial
MDC Building Department

Lift Station 35 – Complete Electrical System Modernization

  • Demolished and removed all outdated electrical components including panels, SCADA box, conduits, wiring, and rack assemblies.
  • Installed new freestanding rack structure with pump control panel, electrical disconnect, transducer, and flow switch integrations.
  • Laid underground conduit systems and wiring networks to support two pumps, flow sensors, and transducer equipment.
  • Relocated and reinstalled existing SCADA communication system including antenna and housing unit.
Terminal J Trash Compactor Power Feed ReplacementCommercial
Miami-Dade Aviation Department

Terminal J Trash Compactor Power Feed Replacement

  • Removed and replaced existing outdoor junction box to ensure safe and code-compliant housing of connections.
  • Installed new conduit runs and feeder wiring from the updated junction box to the designated electrical panel.
  • Tested and verified continuity and system load handling post-installation to ensure readiness for compactor operations.
Building 716 Fire Alarm Upgrade – DHL ZoneCommercial
Miami-Dade Aviation Department

Building 716 Fire Alarm Upgrade – DHL Zone

  • Installed and connected new fire alarm horn/strobe device with associated conduit, junction boxes, and fire-rated wiring.
  • Performed required core drilling and applied fireproofing sealants to all penetrations in accordance with code.
  • Completed pre-testing and coordinated inspections with AHJ (Authority Having Jurisdiction).
  • Coordinated integration and scheduling with Honeywell for fire alarm system programming and verification.
Mobile Garage – Dedicated Feeder Install for Hose CutterCommercial
Miami-Dade Aviation Department

Mobile Garage – Dedicated Feeder Install for Hose Cutter

  • Installed conduit and wire runs from the electrical panel to the new step-down transformer and dedicated outlet.
  • Installed and connected new step-down transformer and NEMA-rated receptacle to serve hose cutting equipment.
  • Connected new branch circuit to existing breaker with proper load balancing.
  • Provided lift rental and ensured safety protocols during elevated work.
Opa-locka Wright Rd – Street Lighting Infrastructure UpgradeCommercial
Miami-Dade Aviation Department

Opa-locka Wright Rd – Street Lighting Infrastructure Upgrade

  • Furnished permit drawings.
  • Handled permitting and inspections.
  • Rented directional drilling equipment (crossing the street), mini escalator, and duck truck/lift.
  • Performed trenching and excavation.
Opa-locka Admission Building – LED Lighting OverhaulCommercial
Miami-Dade Aviation Department

Opa-locka Admission Building – LED Lighting Overhaul

  • Furnished permit drawings.
  • Handled permitting and inspections.
  • Rented directional drilling equipment, trencher, duck truck, boom lift, compactor, and auger drill truck.
  • Performed trenching, excavation, backfill, and soil compacting.
Flamingo Garage – Power Supply Replacement with New RacewayCommercial
Miami-Dade Aviation Department

Flamingo Garage – Power Supply Replacement with New Raceway

  • Disconnected and removed existing HVAC disconnect, breaker, and wiring.
  • Installed new feeder wires to HVAC unit in new conduits, installed a new breaker and a new HVAC disconnect, including reconnection.
  • Installed a service receptacle next to HVAC unit (required by electrical code).
CC-G to CC-H Charger Relocation & Electrical UpgradeCommercial
Miami-Dade Aviation Department

CC-G to CC-H Charger Relocation & Electrical Upgrade

  • Disconnected and removed all existing electrical equipment, including electrical disconnect, 3 charger units, 6 cable wheel posts, electrical conduits, and wires.
  • Installed and connected a new electrical disconnect, existing charger units, existing cable wheel posts, including all needed conduits, wires, and fittings.
  • Installed new feeder conduits and wire for 3 existing charger units, including a new circuit breaker.
  • Designed and provided permit drawings, permitting, and inspections.
CC-G12 Electrical Monument Installation & Circuit ReroutingCommercial
Miami-Dade Aviation Department

CC-G12 Electrical Monument Installation & Circuit Rerouting

  • Performed floor X-Ray and core drilling.
  • Installed and connected 1 receptacle/data floor poke-through box.
  • Connected conduits and wires to floor box.
  • Investigated existing circuits and reconnected to existing breakers.
MIA People Mover Car Wash – Electrical Infrastructure RedesignCommercial
Miami-Dade Aviation Department

MIA People Mover Car Wash – Electrical Infrastructure Redesign

  • Disconnected, removed, and disposed existing conduits and wiring of 2 feeders to mover car wash unit and control station.
  • Installed new conduits and wire between electrical room, control station, and mover car wash unit.
  • Reconnected new feeder wiring to existing breakers, control station, and washer unit.
  • Handled permitting and shop drawings.
Opa-locka Building 176 – Security Camera Power IntegrationCommercial
Miami-Dade Aviation Department

Opa-locka Building 176 – Security Camera Power Integration

  • Installed five (5) new security cameras including accessories as part of Limited Power Systems - Phase 9.
  • Removed and reconnected power feeds and control wiring as required to support camera deployment.
  • Performed all work under Planned Priority Work conditions, per CSBE/MCC 7040 Phase 9 scope.
  • Executed installation without need for additional permits.
Opa-locka Building 212 – Intercom & Communication WiringCommercial
Miami-Dade Aviation Department

Opa-locka Building 212 – Intercom & Communication Wiring

  • Installed new conduits and wire for one outdoor camera, one master intercom station, and three sub intercom stations.
  • Installed and connected all intercom stations, including mounting hardware and RJ45 connectors.
  • Opened and restored ceiling tiles for cable routing.
  • Relocated furniture as needed for installation access.
MIC Intercom System Deployment – MIA TerminalCommercial
Miami-Dade Aviation Department

MIC Intercom System Deployment – MIA Terminal

  • Installed new conduits and wire for one outdoor camera, one master intercom station, and one Aiphone distribution adaptor.
  • Installed and connected intercom stations, including mounting hardware and RJ45 connectors.
  • Opened and restored ceiling tiles for cable routing.
  • Relocated furniture as needed for installation access.
DB4893 Office Intercom System – Multi-Zone InstallationCommercial
Miami-Dade Aviation Department

DB4893 Office Intercom System – Multi-Zone Installation

  • Installed new conduits and wire for two camera door stations, one master intercom station, and seven sub intercom stations.
  • Installed and connected all intercom hardware, including mounting brackets and RJ45 data connectors.
  • Opened and restored ceiling tiles to access routing paths.
  • Relocated furniture as needed to complete installation.
Concourse F – Feeder Cable Replacement & Power Shutdown CoordinationCommercial
Miami-Dade Aviation Department

Concourse F – Feeder Cable Replacement & Power Shutdown Coordination

  • Disconnected and removed existing feeder cables between switchgear room and gate disconnects/pull boxes at gates F3, F5, F9, and F11.
  • Coordinated required gate power shutdown procedures.
  • Provided permit documentation, engineered drawings, and secured inspections.
  • Installed and connected new feeder cables for all specified gates.
Fire Station #846 – Lightning Protection System Repair & UL CertificationCommercial
Miami-Dade Aviation Department

Fire Station #846 – Lightning Protection System Repair & UL Certification

  • Repaired the existing electrical lightning protection system on Fire Station Building #846.
  • Installed all missing components required to restore full system integrity.
  • Coordinated UL inspection and certification of the complete lightning protection system.
  • Verified compliance with relevant electrical and safety standards.
Opa-locka Surge Protection Device Installations – Multiple PanelboardsCommercial
Miami-Dade Aviation Department

Opa-locka Surge Protection Device Installations – Multiple Panelboards

  • Installed and/or replaced surge protection devices (SPDs) and corresponding circuit breakers to safeguard electrical systems.
  • Gate Controller: Installed 2x SPD 120/240V 200kA NEMA 3R units.
  • Panel "TELCO": Installed 1x SPD 208Y/120V, 3-phase, 200kA with LED indicators (NEMA 1R), and 1x 3-phase, 30A breaker (GE A-Series II).
  • Panel "NLB1": Installed 1x SPD 208Y/120V, 3-phase, 200kA with LED indicators (NEMA 1R), and 1x 3-phase, 30A breaker (GE A-Series II).
Flamingo Parking Garage – Security Camera InstallationCommercial
Miami-Dade Aviation Department

Flamingo Parking Garage – Security Camera Installation

  • Furnished and installed new security cameras throughout the Flamingo Motor Parking facility.
  • Installed all associated electrical conduit runs to support camera infrastructure.
  • Pulled and terminated camera cabling for full connectivity and operation.
  • Coordinated installation layout to ensure optimal surveillance coverage.

About ARO Electrical

With over 45 years of experience in the electrical industry, ARO Electrical has built a reputation for excellence, reliability, and outstanding customer service.

Our team of certified electricians stays up-to-date with the latest industry standards and technologies to ensure your systems are safe, efficient, and code-compliant.

50+
Projects Completed
45+
Years Experience

Get In Touch

Ready to start your electrical project? Contact us today for a free consultation.

Email Us

Get a quote or ask questions

[email protected]

Serving Florida

Central Florida South Florida